+2
tram47
GWhizz
6 posters
Go to page : 1, 2, 3  Next
AuthorMessage
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 05, 2012 1:36 pm

Motivated by exhibiting at Chatellerault last weekend, and in discussions with Carl, the idea of having another module that can integrate with both Carl's and MOMI exhibits is very appealing. Without giving away too much at this stage, Carl and I have discussed a new approach that could still integrate with both layouts.

Having done some very preliminary research, here are a couple of pics from the "mood board" to show which way this project may be developing...

Back to top Go down
http://www.frenchgardenrailways.com
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 05, 2012 1:40 pm

Auvergne Mining Project Decauv10

Auvergne Mining Project Decauv11

Decauville ?????
Back to top Go down
http://www.frenchgardenrailways.com
tram47

tram47


Location : Aquitaine (France)

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 05, 2012 2:05 pm



a project may develop?

Auvergne Mining Project 317793 Auvergne Mining Project 972523
Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 05, 2012 7:35 pm

tram47 wrote:
a project may develop?

Bien sûr
Back to top Go down
http://www.frenchgardenrailways.com
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 05, 2012 7:41 pm

Early planning meeting...

Auvergne Mining Project Resize10
Back to top Go down
http://www.frenchgardenrailways.com
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 05, 2012 7:45 pm

Another hint...

Auvergne Mining Project Valrea10
Back to top Go down
http://www.frenchgardenrailways.com
tram47

tram47


Location : Aquitaine (France)

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 05, 2012 7:47 pm

Auvergne Mining Project 317793 we will be patient, but also eager to see the first shots.

Auvergne Mining Project 833270 nous serons patients , mais aussi impatients de voir les premiers plans .
Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptySat Oct 06, 2012 11:55 am

First efforts at fabricating the mine cars for the 40cm gauge rail

I don't like the exposed wheels and will build outside frames, and make the hoppers tip, like the decauville prototypes...
Auvergne Mining Project Tipper10

Stages of hopper fabrication from left to right...
Auvergne Mining Project Tipper11
Back to top Go down
http://www.frenchgardenrailways.com
Carl Hibbs
Admin
Carl Hibbs


Location : Haute Normandie - visitors welcome

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyMon Oct 08, 2012 7:49 pm

Brian that's great.

I love the exposed wheels they look right to me. There is a lot of French 40 cm and 50 cm stuff like that.

I would just file off the axle ends thats all.
Back to top Go down
Paulus

Paulus


Location : The Netherlands

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyMon Oct 08, 2012 8:26 pm

Very nice idea. Looking forward to your progress.
Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyWed Oct 10, 2012 12:54 pm

Carl Hibbs wrote:
I love the exposed wheels they look right to me.

The inside frame was my first attempt, but I've now found these better drawings of Decauville type 24 mine cars that ran on 40cm rail. I think with an outside frame the axles will turn better (less friction) and I'm thinking of possibly making them tip !!



Auvergne Mining Project Hist3l10
Back to top Go down
http://www.frenchgardenrailways.com
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyWed Oct 10, 2012 4:01 pm

Assembled the external shell of the module this afternoon....

Auvergne Mining Project Module10
Front Panel

Auvergne Mining Project Module11
Carcass
Back to top Go down
http://www.frenchgardenrailways.com
Carl Hibbs
Admin
Carl Hibbs


Location : Haute Normandie - visitors welcome

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyWed Oct 10, 2012 7:51 pm

That's really biting the bullet Brian.

I shall be a long way behind you this time but I like the idea of this 40cm line and wonder whether I could do something too.

How big is this new module?
Back to top Go down
tram47

tram47


Location : Aquitaine (France)

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyWed Oct 10, 2012 8:04 pm

Auvergne Mining Project 317793 this is a very original project, congratulations!
Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyWed Oct 10, 2012 9:19 pm

Carl Hibbs wrote:
How big is this new module?

It's 120cm long 90cm Wide to standardise with MOMI and both our Cognac and/or Normandy modules

It's 37cm deep with the mine and a river at lower levels

I shall keep the upper 45mm tracks and surface clear of permanent scenery for ease of transport, any surface scenery/buildings will be removable.

My only concern is the viewing height when mated with MOMI etc, but I will try and design things to be viewed from above. It will be great for kids though and I'm thinking about seeing into the mine tunnels with lighting etc
Back to top Go down
http://www.frenchgardenrailways.com
tram47

tram47


Location : Aquitaine (France)

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyWed Oct 10, 2012 9:37 pm

Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptySat Oct 13, 2012 4:50 pm

After several attempts at building outside frame mine wagons, I've finally decided that Carl is right and the exposed wheels on an inside frame do look better at this 40cm Gauge. But I have added a tipping function...

Auvergne Mining Project Mine_w10


I've also completed all the major structural elements in plywood with the river bed and valley floor. I plan to add all the future elements in polystyrene to save weight Shocked

Auvergne Mining Project Valley10

The 16.5mm (40cm gauge) track is in and wired, just awaiting a suitable donor HO motor block !!!
Back to top Go down
http://www.frenchgardenrailways.com
Carl Hibbs
Admin
Carl Hibbs


Location : Haute Normandie - visitors welcome

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptySat Oct 13, 2012 5:59 pm

Excellent....

I will give you a motor block at Railexpo. I have a couple of old OO motor bogies lying around.

How did you make the track? It doesn't look (the) HO track you bought.

Back to top Go down
David Grantham




Location : Midlands, England

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptySat Oct 13, 2012 6:10 pm

Great concept Brian.
Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptySat Oct 13, 2012 6:56 pm

Carl Hibbs wrote:
How did you make the track?

As well as the flexitrack, I also bought some secondhand Jouef HO set track from the guy opposite us at Chatellerault for a couple of Euro's.

It's a slightly cruder profile and I've chopped out most of the sleepers and spaced them apart in the visible sections, the flexitrack was needed to get a tight radius behind the backscene, but will be out of sight!

Thanks for the offer of a motor block, I'm also on the lookout for a 12 volt controller if anyone has a spare?
Back to top Go down
http://www.frenchgardenrailways.com
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 19, 2012 9:54 am

Hi Carl
I'm planning to build a girder bridge, LGB style for the module, but want to make sure it can accomodate the largest of your live steam and diesel models.
What would be the minimum loading gauge required?
Auvergne Mining Project Img_6910
Back to top Go down
http://www.frenchgardenrailways.com
Carl Hibbs
Admin
Carl Hibbs


Location : Haute Normandie - visitors welcome

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 19, 2012 3:39 pm

The maximum width of the stock I have is about 120 mm even the big old green diesel.
Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 19, 2012 3:55 pm

And the height?
Back to top Go down
http://www.frenchgardenrailways.com
Carl Hibbs
Admin
Carl Hibbs


Location : Haute Normandie - visitors welcome

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 19, 2012 5:38 pm

I would allow 180 mm for the height (from the track) as I have this big 030 German tank.

I think the LGB bridge will be ok but what are you going to make yours from?
Back to top Go down
GWhizz

GWhizz


Location : Charente, France

Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project EmptyFri Oct 19, 2012 7:10 pm

Probably brass U section or plastic!

It will in fact only be a cosmetic add-on to the upper module, all the detail and animation will be within the module itself for ease of transport, just planning ahead at this stage!

Cheers
Back to top Go down
http://www.frenchgardenrailways.com
Sponsored content





Auvergne Mining Project Empty
PostSubject: Re: Auvergne Mining Project   Auvergne Mining Project Empty

Back to top Go down
 
Auvergne Mining Project
Back to top 
Page 1 of 3Go to page : 1, 2, 3  Next
 Similar topics
-
» New project
» Old project
» OBB Brake Van project
» 16mmngm Project Loco
» Automotrice à vapeur (new project)

Permissions in this forum:You cannot reply to topics in this forum
Continental Garden Trains :: Continental Garden Trains index :: Events-
Jump to: